- Postcode districts
- TW3, TW4, TW5, TW7, TW8, TW13 + 2 more
- Nearby
- Isleworth, Heston and Feltham
- Guide price
- £55–£110 per m²
- Typical time on site
- 2–4 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does bathroom tiling cost in Hounslow?
Our guide price for bathroom tiling in Hounslow is £55–£110 per m² including VAT. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Ceramic
- Grout and trims
Porcelain
- Porcelain walls and floor
Large-format or stone
- Mitred edges, niches
Guide prices for Hounslow including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hounslow
In Hounslow we cover TW3, TW4, TW5 and 5 more postcode districts; we also cover Isleworth, 0.9 miles away, and Heston.
In Hounslow, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If you want a tiled shower floor in your Hounslow bathroom, the tanking and drainage are planned before the tile is chosen. For Hounslow flats, we check the lease and the floor build-up before laying hard tiles on a timber floor.
Water across much of Greater London is very hard. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Setting out so cuts are even and joints line up with niches, windows and edges
- Floor preparation: overlaying timber floors with ply or backer board, or levelling a screed
- Fixing with an adhesive suited to the tile and the surface, with levelling clips for large tiles
- Measuring wall and floor areas and working out quantities with an allowance for cuts
Decisions to make first
Edges
Metal or PVC trims are quick and protect tile edges. Mitred edges look cleaner on porcelain and take more labour.
Grout
Cement-based grout is standard. Epoxy grout resists stains and mould better and suits showers, but takes longer to apply and costs more.
Rules that apply in England
In England, tiling itself is not building regulations work. If it is part of forming a level shower floor with new drainage, that drainage can be Part H work, and any new electrics are covered by Part P.