- Postcode districts
- SO40
- Nearby
- Southampton, Romsey and Hythe
- Guide price
- £50–£100 per m²
- Typical time on site
- 2–4 working days
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does bathroom tiling cost in Totton?
In Totton, bathroom tiling typically costs £50–£100 per m² including VAT, based on South East England prices. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Ceramic
- Grout and trims
Porcelain
- Porcelain walls and floor
Large-format or stone
- Mitred edges, niches
Guide prices for Totton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Totton
In Totton we cover SO40; we also cover Southampton, 3.9 miles away, and Romsey.
In Totton, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If you want a tiled shower floor in your Totton bathroom, the tanking and drainage are planned before the tile is chosen. If your Totton home has hard water, larger tiles and epoxy grout leave fewer joints for limescale to build up in.
Water across much of Hampshire is hard. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Measuring wall and floor areas and working out quantities with an allowance for cuts
- Grouting, trims or mitred edges, and silicone at internal corners, the bath and the tray
- Floor preparation: overlaying timber floors with ply or backer board, or levelling a screed
- Setting out so cuts are even and joints line up with niches, windows and edges
Decisions to make first
Ceramic or porcelain
Ceramic is lighter, easier to cut and cheaper, and is fine on walls. Porcelain is denser and absorbs less water, so it suits floors and showers.
Edges
Metal or PVC trims are quick and protect tile edges. Mitred edges look cleaner on porcelain and take more labour.
Rules that apply in England
In England, tiling itself is not building regulations work. If it is part of forming a level shower floor with new drainage, that drainage can be Part H work, and any new electrics are covered by Part P.

