- Postcode districts
- TN23, TN24
- Nearby
- Faversham, Canterbury and Folkestone
- Guide price
- £50–£100 per m²
- Typical time on site
- 2–4 working days
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does bathroom tiling cost in Ashford?
As a guide, budget £50 to £100 per m² including VAT for bathroom tiling in Ashford; your written quote will pin it down. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Ceramic
- Standard ceramic wall tiles
Porcelain
- Full height in wet zones
Large-format or stone
- Sealing where needed
Guide prices for Ashford including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Ashford
We cover every part of Ashford, including TN23 and TN24, and nearby Faversham (11.6 miles) and Canterbury (12.8 miles).
In Ashford, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. We measure tiled areas in Ashford bathrooms on site, so the quote is based on real square metres. Tiling quotes in Ashford list the tile, the area and the preparation separately, so you can compare like for like.
Most of Kent has very hard water. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Tanking the shower area and the walls around the bath with a waterproof membrane or liquid system
- Measuring wall and floor areas and working out quantities with an allowance for cuts
- Grouting, trims or mitred edges, and silicone at internal corners, the bath and the tray
- Setting out so cuts are even and joints line up with niches, windows and edges
Decisions to make first
Edges
Metal or PVC trims are quick and protect tile edges. Mitred edges look cleaner on porcelain and take more labour.
Grout
Cement-based grout is standard. Epoxy grout resists stains and mould better and suits showers, but takes longer to apply and costs more.
Rules that apply in England
In England, tiling itself is not building regulations work. If it is part of forming a level shower floor with new drainage, that drainage can be Part H work, and any new electrics are covered by Part P.

