- Postcode districts
- BA1, BA2
- Nearby
- Keynsham, Trowbridge and Kingswood
- Guide price
- £45–£90 per m²
- Typical time on site
- 2–4 working days
- Water
- Hard across most of Somerset
- Survey
- Free, at your home
What does bathroom tiling cost in Bath?
Guide price in Bath: £45–£90 per m² including VAT, depending on the room and what you choose. The figure depends on the size of the room, whether anything moves, and the products you pick.
Ceramic
- Grout and trims
Porcelain
- Porcelain walls and floor
Large-format or stone
- Mitred edges, niches
Guide prices for Bath including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Bath
We work right across Bath — BA1 and BA2 — and in neighbouring Keynsham and Trowbridge.
Bath is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. If your Bath home has hard water, larger tiles and epoxy grout leave fewer joints for limescale to build up in. For Bath flats, we check the lease and the floor build-up before laying hard tiles on a timber floor.
Water across much of Somerset is hard. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Checking walls for flatness and strength, and boarding with cement-based backer board where needed
- Fixing with an adhesive suited to the tile and the surface, with levelling clips for large tiles
- Sealing natural stone and cleaning off grout haze before handover
- Grouting, trims or mitred edges, and silicone at internal corners, the bath and the tray
Decisions to make first
Floor grip
For a bathroom floor, choose a matt or textured tile with a slip rating of R10 or above. Smaller tiles with more grout lines grip better in a shower.
Grout
Cement-based grout is standard. Epoxy grout resists stains and mould better and suits showers, but takes longer to apply and costs more.
Rules that apply in England
In England, tiling itself is not building regulations work. If it is part of forming a level shower floor with new drainage, that drainage can be Part H work, and any new electrics are covered by Part P.

