- Postcode districts
- DY1, DY4, WV14
- Nearby
- Dudley, Wednesbury and West Bromwich
- Guide price
- £45–£90 per m²
- Typical time on site
- 2–4 working days
- Water
- Varies across the West Midlands
- Survey
- Free, at your home
What does bathroom tiling cost in Tipton?
Guide price in Tipton: £45–£90 per m² including VAT, depending on the room and what you choose. The figure depends on the size of the room, whether anything moves, and the products you pick.
Ceramic
- Standard ceramic wall tiles
Porcelain
- Full height in wet zones
Large-format or stone
- Sealing where needed
Guide prices for Tipton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Tipton
We cover every part of Tipton, including DY1, DY4 and WV14, and nearby Dudley (2.1 miles) and Wednesbury (2.4 miles).
Homes in and around Tipton vary, so we look at the floor, the walls and the water system before we price anything. For Tipton flats, we check the lease and the floor build-up before laying hard tiles on a timber floor. If you want a tiled shower floor in your Tipton bathroom, the tanking and drainage are planned before the tile is chosen.
Hardness differs from one part of the West Midlands to the next. Mid-tone grout and matt tiles hide the odd water mark better than dark grout and high gloss. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Grouting, trims or mitred edges, and silicone at internal corners, the bath and the tray
- Setting out so cuts are even and joints line up with niches, windows and edges
- Floor preparation: overlaying timber floors with ply or backer board, or levelling a screed
- Tanking the shower area and the walls around the bath with a waterproof membrane or liquid system
Decisions to make first
Edges
Metal or PVC trims are quick and protect tile edges. Mitred edges look cleaner on porcelain and take more labour.
Floor grip
For a bathroom floor, choose a matt or textured tile with a slip rating of R10 or above. Smaller tiles with more grout lines grip better in a shower.
Rules that apply in England
In England, tiling itself is not building regulations work. If it is part of forming a level shower floor with new drainage, that drainage can be Part H work, and any new electrics are covered by Part P.

