- Postcode districts
- RH16
- Nearby
- Burgess Hill, Crawley and Uckfield
- Guide price
- £50–£100 per m²
- Typical time on site
- 2–4 working days
- Water
- Hard across most of West Sussex
- Survey
- Free, at your home
What does bathroom tiling cost in Haywards Heath?
Guide price in Haywards Heath: £50–£100 per m² including VAT, depending on the room and what you choose. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Ceramic
- Wet areas or half height
Porcelain
- Levelling system for large tiles
Large-format or stone
- Large-format porcelain or natural stone
Guide prices for Haywards Heath including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Haywards Heath
We cover every part of Haywards Heath, including RH16, and nearby Burgess Hill (3 miles) and Crawley (8.7 miles).
Homes in and around Haywards Heath vary, so we look at the floor, the walls and the water system before we price anything. If you want a tiled shower floor in your Haywards Heath bathroom, the tanking and drainage are planned before the tile is chosen. Whatever the age of your Haywards Heath home, large-format tiles need flat walls, so the survey checks how much preparation they will take.
Most of West Sussex has hard water. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Tanking the shower area and the walls around the bath with a waterproof membrane or liquid system
- Floor preparation: overlaying timber floors with ply or backer board, or levelling a screed
- Measuring wall and floor areas and working out quantities with an allowance for cuts
- Fixing with an adhesive suited to the tile and the surface, with levelling clips for large tiles
Decisions to make first
Edges
Metal or PVC trims are quick and protect tile edges. Mitred edges look cleaner on porcelain and take more labour.
Grout
Cement-based grout is standard. Epoxy grout resists stains and mould better and suits showers, but takes longer to apply and costs more.
Rules that apply in England
In England, tiling itself is not building regulations work. If it is part of forming a level shower floor with new drainage, that drainage can be Part H work, and any new electrics are covered by Part P.

