What does bathroom tiling cost in Wiltshire?
Our guide range in Wiltshire is £45–£90 per m² including VAT.
Ceramic
- Wet areas or half height
Porcelain
- Levelling system for large tiles
Large-format or stone
- Large-format porcelain or natural stone
Guide prices for Wiltshire including VAT. Your itemised written quote after the free survey is the price that counts.
Which towns do we cover in Wiltshire?
Most of Wiltshire has hard water. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier. We measure tiled areas in Swindon bathrooms on site, so the quote is based on real square metres.
What the job includes
- Checking walls for flatness and strength, and boarding with cement-based backer board where needed
- Tanking the shower area and the walls around the bath with a waterproof membrane or liquid system
- Setting out so cuts are even and joints line up with niches, windows and edges
- Measuring wall and floor areas and working out quantities with an allowance for cuts
- Floor preparation: overlaying timber floors with ply or backer board, or levelling a screed
- Fixing with an adhesive suited to the tile and the surface, with levelling clips for large tiles
Decisions to make first
Grout
Cement-based grout is standard. Epoxy grout resists stains and mould better and suits showers, but takes longer to apply and costs more.
Floor grip
For a bathroom floor, choose a matt or textured tile with a slip rating of R10 or above. Smaller tiles with more grout lines grip better in a shower.
Natural stone
Marble, limestone and travertine need sealing and gentle cleaners, and can mark. Stone-effect porcelain gives a similar look without the upkeep.
Ceramic or porcelain
Ceramic is lighter, easier to cut and cheaper, and is fine on walls. Porcelain is denser and absorbs less water, so it suits floors and showers.
Rules that apply in England
Re-tiling a bathroom does not need planning permission or building regulations approval. In a flat, check the lease before changing to hard floor tiles, because sound insulation and the risk of leaks to the flat below matter, and wet rooms often need freeholder consent. In a listed building, removing original tiles that contribute to its character can need listed building consent.
In England, tiling itself is not building regulations work. If it is part of forming a level shower floor with new drainage, that drainage can be Part H work, and any new electrics are covered by Part P.

