- Postcode districts
- CB8
- Nearby
- Haverhill, Ely and Cambridge
- Guide price
- £1,900–£4,800
- Typical time on site
- 2–4 working days
- Water
- Very hard across most of Cambridgeshire
- Survey
- Free, at your home
What does a cloakroom or downstairs WC cost in Newmarket?
Our guide price for a cloakroom or downstairs WC in Newmarket is £1,900–£4,800 including VAT. We adjust the national guide for East of England, where prices are typically about 6% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Splashback tiling, new floor
Upgrade
- Wall-hung WC with concealed frame
New cloakroom
- New waste or macerator
Guide prices for Newmarket including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Newmarket
As well as Newmarket itself (CB8), we survey in Haverhill, Ely and Cambridge.
Being a smaller town does not change how we work in Newmarket: free survey, written quote, one team. We survey cloakrooms in Newmarket with the headroom in mind as well as the floor area, because under-stair spaces lose height quickly. Where your Newmarket home already has a WC on gravity drainage, a macerator opens up more places a new cloakroom can go.
Water across much of Cambridgeshire is very hard. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Strip-out of the old fittings, waste removal and making good on the hall side
- Lighting wired by a qualified electrician, tested and certified
- A new waste connection to the soil stack or drain, or a macerator where the rules allow it
- A concealed cistern frame or WC unit where the space allows
Decisions to make first
Finishes
A small room can carry a bolder tile or wallpaper. A feature wall behind the WC costs far less here than in a full bathroom because there is so little of it.
Door
An outward-opening door is usually needed so it does not hit the WC. A sliding door suits a narrow hallway where an outward door would block the way.
Rules that apply in England
In England, a new WC connected to the soil stack or drain is drainage work under Part H, and a newly formed cloakroom without an opening window should have mechanical extract; Approved Document F gives 6 litres per second as the design rate for a WC, against 15 for a bathroom. Because a cloakroom has no bath or shower, adding a light to an existing circuit is not notifiable under Part P, but a new circuit is.

