- Postcode districts
- KT1, KT5, KT6
- Nearby
- East Molesey, Esher and West Molesey
- Guide price
- £2,200–£5,600
- Typical time on site
- 2–4 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a cloakroom or downstairs WC cost in Surbiton?
As a guide, budget £2,200 to £5,600 including VAT for a cloakroom or downstairs WC in Surbiton; your written quote will pin it down. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Splashback tiling, new floor
Upgrade
- Wall-hung WC with concealed frame
New cloakroom
- New waste or macerator
Guide prices for Surbiton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Surbiton
We work right across Surbiton — KT1, KT5 and KT6 — and in neighbouring East Molesey and Esher.
London homes in Surbiton often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. For a new cloakroom in Surbiton, the first thing we look at is where the nearest drain or soil stack runs. Where your Surbiton home already has a WC on gravity drainage, a macerator opens up more places a new cloakroom can go.
Most of Greater London has very hard water. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A concealed cistern frame or WC unit where the space allows
- Lighting wired by a qualified electrician, tested and certified
- A survey that checks the headroom under the stairs, the door swing and how the waste will reach the drain
- Strip-out of the old fittings, waste removal and making good on the hall side
Decisions to make first
WC style
A wall-hung WC on a frame gives the most floor space and looks neat. A back-to-wall pan in a short furniture unit is easier to fit against an uneven wall.
Under-stair layout
Headroom drops quickly under stairs. The basin and the space in front of the WC need standing height; the low end of the room can take the cistern or storage.
Rules that apply in England
In England, a new WC connected to the soil stack or drain is drainage work under Part H, and a newly formed cloakroom without an opening window should have mechanical extract; Approved Document F gives 6 litres per second as the design rate for a WC, against 15 for a bathroom. Because a cloakroom has no bath or shower, adding a light to an existing circuit is not notifiable under Part P, but a new circuit is.