- Postcode districts
- DA3, DA4, DA13
- Nearby
- Hartley, Swanscombe and Gravesend
- Guide price
- £2,000–£5,000
- Typical time on site
- 2–4 working days
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does a cloakroom or downstairs WC cost in Longfield?
Our guide price for a cloakroom or downstairs WC in Longfield is £2,000–£5,000 including VAT. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Compact WC and corner or wall basin
Upgrade
- Feature tiles and lighting
New cloakroom
- Formed under the stairs or in a utility
Guide prices for Longfield including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Longfield
As well as Longfield itself (DA3, DA4 and DA13), we survey in Hartley, Swanscombe and Gravesend.
Being a smaller town does not change how we work in Longfield: free survey, written quote, one team. We survey cloakrooms in Longfield with the headroom in mind as well as the floor area, because under-stair spaces lose height quickly. If you are refreshing a dated cloakroom in Longfield, a wall-hung WC and slim vanity can change the room in a few days.
Most of Kent has very hard water. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Compact sanitaryware: a short-projection, back-to-wall or wall-hung WC and a corner, wall-hung or slim vanity basin
- Splashback or feature tiling and a new floor, often LVT or porcelain
- Strip-out of the old fittings, waste removal and making good on the hall side
- A concealed cistern frame or WC unit where the space allows
Decisions to make first
Finishes
A small room can carry a bolder tile or wallpaper. A feature wall behind the WC costs far less here than in a full bathroom because there is so little of it.
WC style
A wall-hung WC on a frame gives the most floor space and looks neat. A back-to-wall pan in a short furniture unit is easier to fit against an uneven wall.
Rules that apply in England
In England, a new WC connected to the soil stack or drain is drainage work under Part H, and a newly formed cloakroom without an opening window should have mechanical extract; Approved Document F gives 6 litres per second as the design rate for a WC, against 15 for a bathroom. Because a cloakroom has no bath or shower, adding a light to an existing circuit is not notifiable under Part P, but a new circuit is.