- Postcode districts
- DN15, DN16, DN17
- Nearby
- Brough, Goole and Thorne
- Guide price
- £1,750–£4,300
- Typical time on site
- 2–4 working days
- Water
- Hard across most of Lincolnshire
- Survey
- Free, at your home
What does a cloakroom or downstairs WC cost in Scunthorpe?
Our guide price for a cloakroom or downstairs WC in Scunthorpe is £1,750–£4,300 including VAT. We adjust the national guide for East Midlands, where prices are typically about 4% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Splashback tiling, new floor
Upgrade
- Wall-hung WC with concealed frame
New cloakroom
- New waste or macerator
Guide prices for Scunthorpe including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Scunthorpe
As well as Scunthorpe itself (DN15, DN16 and DN17), we survey in Brough, Goole and Thorne.
Scunthorpe has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. We survey cloakrooms in Scunthorpe with the headroom in mind as well as the floor area, because under-stair spaces lose height quickly. Where your Scunthorpe home already has a WC on gravity drainage, a macerator opens up more places a new cloakroom can go.
Supplies across most of Lincolnshire are hard. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Splashback or feature tiling and a new floor, often LVT or porcelain
- A new waste connection to the soil stack or drain, or a macerator where the rules allow it
- A survey that checks the headroom under the stairs, the door swing and how the waste will reach the drain
- Strip-out of the old fittings, waste removal and making good on the hall side
Decisions to make first
Door
An outward-opening door is usually needed so it does not hit the WC. A sliding door suits a narrow hallway where an outward door would block the way.
Under-stair layout
Headroom drops quickly under stairs. The basin and the space in front of the WC need standing height; the low end of the room can take the cistern or storage.
Rules that apply in England
In England, a new WC connected to the soil stack or drain is drainage work under Part H, and a newly formed cloakroom without an opening window should have mechanical extract; Approved Document F gives 6 litres per second as the design rate for a WC, against 15 for a bathroom. Because a cloakroom has no bath or shower, adding a light to an existing circuit is not notifiable under Part P, but a new circuit is.

