- Postcode districts
- WS3, WV12, WV13
- Nearby
- Wednesfield, Wolverhampton and Wednesbury
- Guide price
- £1,750–£4,400
- Typical time on site
- 2–4 working days
- Water
- Varies across the West Midlands
- Survey
- Free, at your home
What does a cloakroom or downstairs WC cost in Willenhall?
Our guide price for a cloakroom or downstairs WC in Willenhall is £1,750–£4,400 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Existing downstairs WC
Upgrade
- Vanity basin with storage
New cloakroom
- Extractor fan to regulations
Guide prices for Willenhall including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Willenhall
We work right across Willenhall — WS3, WV12 and WV13 — and in neighbouring Wednesfield and Wolverhampton.
In Willenhall, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. For a new cloakroom in Willenhall, the first thing we look at is where the nearest drain or soil stack runs. We survey cloakrooms in Willenhall with the headroom in mind as well as the floor area, because under-stair spaces lose height quickly.
Hardness differs from one part of the West Midlands to the next. Taps and wastes will need an occasional descale, and chrome or brushed finishes are easier to keep clean than polished brass. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A concealed cistern frame or WC unit where the space allows
- An extractor fan ducted to outside, wired with an overrun timer or linked to the light
- A survey that checks the headroom under the stairs, the door swing and how the waste will reach the drain
- Strip-out of the old fittings, waste removal and making good on the hall side
Decisions to make first
Door
An outward-opening door is usually needed so it does not hit the WC. A sliding door suits a narrow hallway where an outward door would block the way.
Finishes
A small room can carry a bolder tile or wallpaper. A feature wall behind the WC costs far less here than in a full bathroom because there is so little of it.
Rules that apply in England
In England, a new WC connected to the soil stack or drain is drainage work under Part H, and a newly formed cloakroom without an opening window should have mechanical extract; Approved Document F gives 6 litres per second as the design rate for a WC, against 15 for a bathroom. Because a cloakroom has no bath or shower, adding a light to an existing circuit is not notifiable under Part P, but a new circuit is.

