- Postcode districts
- E13, E14, E16
- Nearby
- Stratford, Bow and Canary Wharf
- Guide price
- £5,600–£11,250
- Typical time on site
- 4–8 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does an en-suite cost in Canning Town?
Our guide price for an en-suite in Canning Town is £5,600–£11,250 including VAT. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Shower, basin and WC replaced
Upgrade
- Full-height porcelain tiling
New en-suite
- Formed inside an existing bedroom
Guide prices for Canning Town including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Canning Town
As well as Canning Town itself (E13, E14 and E16), we survey in Stratford, Bow and Canary Wharf.
London homes in Canning Town often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. For an en-suite in Canning Town, the first question at the survey is always where the waste can reach the soil stack. If your Canning Town home has one bathroom and a good-sized main bedroom, an en-suite is often the change that eases the morning queue.
Supplies across most of Greater London are very hard. If your supply in Canning Town is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- IP-rated lighting, a shaver socket and the electrics done by a qualified electrician, tested and certified
- A short-projection or wall-hung WC and a compact basin chosen to keep the floor clear
- An extractor fan ducted to outside, sized to the room and wired with an overrun timer or humidistat
- A survey that traces the route from the en-suite to the soil stack and checks the fall the waste pipes would need
Decisions to make first
Refit or new en-suite
A refit keeps the existing drainage and walls. A new en-suite costs more because the walls, waste route, fan duct and electrics all start from nothing.
Night lighting
A mirror light or low-level LED strip on its own switch lets you use the en-suite at night without the full glare of the ceiling lights.
Rules that apply in England
In England, a new en-suite brings in Part H for the new connection to the soil stack, Approved Document F for ventilation, at 15 litres per second intermittent or 8 litres per second continuous extract, and Part P for the new circuits. The electrician should be registered with a competent person scheme, or the work notified to building control. On a refit, avoid replacing the fan with a less effective one.

