- Postcode districts
- DH9
- Nearby
- Chester-le-Street, Consett and Whickham
- Guide price
- £5,800–£11,750
- Typical time on site
- 6–12 working days
- Water
- Moderately hard across most of County Durham
- Survey
- Free, at your home
What does a loft bathroom cost in Stanley?
In Stanley, a loft bathroom typically costs £5,800–£11,750 including VAT, based on North East England prices. Labour costs in North East England put local prices at about 10% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Shower, basin and WC replaced
Signature
- Pump or macerator where needed
New loft bathroom
- Formed in an existing loft room
Guide prices for Stanley including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Stanley
In Stanley we cover DH9; we also cover Chester-le-Street, 5 miles away, and Consett.
Homes in and around Stanley vary, so we look at the floor, the walls and the water system before we price anything. If your Stanley home has a gravity-drained WC on another floor, a macerator in the loft may open up more layout options. If your Stanley loft conversion has a bedroom but no bathroom, the survey starts with where the soil stack runs and how much headroom you have.
Most of County Durham has moderately hard water. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Stanley. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A drainage route from the loft to the soil stack with enough fall, or a pumped waste or macerator where the rules allow it
- A shower pump on a gravity system, an electric shower, or advice on moving to mains pressure, depending on your system
- A check of the floor joists where a bath or large shower tray will sit
- Fitted furniture made to the eaves, so the low space behind the slope becomes storage
Decisions to make first
Roof window
A roof window over the bath or shower brings daylight and fresh air, but plan the blind for privacy and expect condensation on cold glass.
Bath or no bath
A bath under the slope makes good use of low space, but the floor has to carry it when it is full of water and someone is in it.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

