- Postcode districts
- TQ1, TQ2, TQ3, TQ4
- Nearby
- Paignton, Brixham and Newton Abbot
- Guide price
- £6,600–£13,250
- Typical time on site
- 6–12 working days
- Water
- Soft across most of Devon
- Survey
- Free, at your home
What does a loft bathroom cost in Torquay?
In Torquay, a loft bathroom typically costs £6,600–£13,250 including VAT, based on South West England prices. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Existing loft shower room
Signature
- Fitted furniture to the eaves
New loft bathroom
- Ventilation and electrics to regulations
Guide prices for Torquay including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Torquay
As well as Torquay itself (TQ1, TQ2, TQ3 and 1 more postcode districts), we survey in Paignton, Brixham and Newton Abbot.
In Torquay, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If your Torquay loft shower is weak or the waste drains slowly, the fix is often in the pump or the pipe fall rather than the shower itself. If your Torquay home has a gravity-drained WC on another floor, a macerator in the loft may open up more layout options.
Water across much of Devon is soft. If that holds for your street in Torquay, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A drainage route from the loft to the soil stack with enough fall, or a pumped waste or macerator where the rules allow it
- A check of your hot-water system and of the pressure and flow you actually get at loft level
- A shower pump on a gravity system, an electric shower, or advice on moving to mains pressure, depending on your system
- Fitted furniture made to the eaves, so the low space behind the slope becomes storage
Decisions to make first
Eaves storage
Low cupboards built into the slope behind the WC or basin take clutter out of the room and hide the pipework.
Bath or no bath
A bath under the slope makes good use of low space, but the floor has to carry it when it is full of water and someone is in it.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

