- Postcode districts
- W3, W4, W6
- Nearby
- Acton, Shepherds Bush and Fulham
- Guide price
- £8,100–£16,250
- Typical time on site
- 6–12 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a loft bathroom cost in Chiswick?
For Chiswick, our guide range for a loft bathroom is £8,100 to £16,250 including VAT. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Tiling, lighting, extractor fan
Signature
- Walk-in shower under the ridge
New loft bathroom
- New drainage route and water supply
Guide prices for Chiswick including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Chiswick
As well as Chiswick itself (W3, W4 and W6), we survey in Acton, Shepherds Bush and Fulham.
In Chiswick, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If your Chiswick loft shower is weak or the waste drains slowly, the fix is often in the pump or the pipe fall rather than the shower itself. For a loft bathroom in a tank-fed Chiswick home, we work out how the shower will get its pressure before choosing a single fitting.
Most of Greater London has very hard water. If your supply in Chiswick is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Fitted furniture made to the eaves, so the low space behind the slope becomes storage
- An extractor fan ducted through the roof or a gable wall, with the duct insulated through cold spaces
- Electrics by a qualified electrician, tested and certified, then tiling, testing and handover
- A check of the floor joists where a bath or large shower tray will sit
Decisions to make first
Bath or no bath
A bath under the slope makes good use of low space, but the floor has to carry it when it is full of water and someone is in it.
Eaves storage
Low cupboards built into the slope behind the WC or basin take clutter out of the room and hide the pipework.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

