- Postcode districts
- CH46, CH47, CH49
- Nearby
- Wallasey, Birkenhead and Heswall
- Guide price
- £6,100–£12,250
- Typical time on site
- 6–12 working days
- Water
- Soft across most of Merseyside
- Survey
- Free, at your home
What does a loft bathroom cost in Moreton?
In Moreton, a loft bathroom typically costs £6,100–£12,250 including VAT, based on North West England prices. Labour costs in North West England put local prices at about 6% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Tiling, lighting, extractor fan
Signature
- Walk-in shower under the ridge
New loft bathroom
- New drainage route and water supply
Guide prices for Moreton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Moreton
As well as Moreton itself (CH46, CH47 and CH49), we survey in Wallasey, Birkenhead and Heswall.
Moreton gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If your Moreton house has a combi boiler, a loft shower can usually run on mains pressure without a pump. For a loft bathroom in a tank-fed Moreton home, we work out how the shower will get its pressure before choosing a single fitting.
Water across much of Merseyside is soft. If that holds for your street in Moreton, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Electrics by a qualified electrician, tested and certified, then tiling, testing and handover
- A check of your hot-water system and of the pressure and flow you actually get at loft level
- An extractor fan ducted through the roof or a gable wall, with the duct insulated through cold spaces
- A survey of the headroom across the room, with the usable height marked at each fitting position
Decisions to make first
Bath or no bath
A bath under the slope makes good use of low space, but the floor has to carry it when it is full of water and someone is in it.
Getting the water pressure
A pumped shower suits a gravity system with a cold tank; an electric shower heats cold mains water at the point of use; a combi or unvented cylinder gives mains pressure throughout.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

