- Postcode districts
- S80, S81
- Nearby
- Dinnington, Retford and Maltby
- Guide price
- £6,200–£12,500
- Typical time on site
- 6–12 working days
- Water
- Hard across most of Nottinghamshire
- Survey
- Free, at your home
What does a loft bathroom cost in Worksop?
Guide price in Worksop: £6,200–£12,500 including VAT, depending on the room and what you choose. Labour costs in East Midlands put local prices at about 4% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Tiling, lighting, extractor fan
Signature
- Walk-in shower under the ridge
New loft bathroom
- New drainage route and water supply
Guide prices for Worksop including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Worksop
We cover every part of Worksop, including S80 and S81, and nearby Dinnington (5.5 miles) and Retford (7.6 miles).
In Worksop, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If your Worksop home has a gravity-drained WC on another floor, a macerator in the loft may open up more layout options. If your Worksop house has a combi boiler, a loft shower can usually run on mains pressure without a pump.
Most of Nottinghamshire has hard water. If your supply in Worksop is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Electrics by a qualified electrician, tested and certified, then tiling, testing and handover
- A shower pump on a gravity system, an electric shower, or advice on moving to mains pressure, depending on your system
- An extractor fan ducted through the roof or a gable wall, with the duct insulated through cold spaces
- A survey of the headroom across the room, with the usable height marked at each fitting position
Decisions to make first
Eaves storage
Low cupboards built into the slope behind the WC or basin take clutter out of the room and hide the pipework.
Where the shower goes
Under the ridge or in a dormer, where the full height is. A walk-in shower with a single panel is usually easier to fit to a roof line than a framed enclosure.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

