- Postcode districts
- WR1, WR2, WR3, WR4, WR5, WR8
- Nearby
- Droitwich, Great Malvern and Stourport-on-Severn
- Guide price
- £6,400–£12,750
- Typical time on site
- 6–12 working days
- Water
- Moderately hard across most of Worcestershire
- Survey
- Free, at your home
What does a loft bathroom cost in Worcester?
As a guide, budget £6,400 to £12,750 including VAT for a loft bathroom in Worcester; your written quote will pin it down. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Shower, basin and WC replaced
Signature
- Pump or macerator where needed
New loft bathroom
- Formed in an existing loft room
Guide prices for Worcester including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Worcester
We cover every part of Worcester, including WR1, WR2, WR3 and 3 more postcode districts, and nearby Droitwich (6.1 miles) and Great Malvern (7 miles).
In a city the size of Worcester, parking and access for a skip are worth sorting before the start date — we will ask at the survey. For a loft bathroom in a tank-fed Worcester home, we work out how the shower will get its pressure before choosing a single fitting. We plan loft bathrooms in Worcester around the roof line, so the shower sits where you can stand and the eaves become storage.
Most of Worcestershire has moderately hard water. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Worcester. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A drainage route from the loft to the soil stack with enough fall, or a pumped waste or macerator where the rules allow it
- A survey of the headroom across the room, with the usable height marked at each fitting position
- An extractor fan ducted through the roof or a gable wall, with the duct insulated through cold spaces
- A check of the floor joists where a bath or large shower tray will sit
Decisions to make first
Where the shower goes
Under the ridge or in a dormer, where the full height is. A walk-in shower with a single panel is usually easier to fit to a roof line than a framed enclosure.
Eaves storage
Low cupboards built into the slope behind the WC or basin take clutter out of the room and hide the pipework.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

