- Postcode districts
- CW5
- Nearby
- Crewe, Sandbach and Winsford
- Guide price
- £400–£3,300
- Typical time on site
- half a day to 3 days
- Water
- Moderately hard across most of Cheshire
- Survey
- Free, at your home
What does a new shower cost in Nantwich?
Guide price in Nantwich: £400–£3,300 including VAT, depending on the room and what you choose. We adjust the national guide for North West England, where prices are typically about 6% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Test and handover
New shower over bath
- Thermostatic bar shower and riser
New shower with enclosure
- Pipework and waste
Guide prices for Nantwich including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Nantwich
We work right across Nantwich — CW5 — and in neighbouring Crewe and Sandbach.
Being a smaller town does not change how we work in Nantwich: free survey, written quote, one team. If your Nantwich bath has no shower over it, a thermostatic bar shower, screen and tiling can usually be added in a day or two. If you want a shower in your Nantwich home that works when the boiler is off, an electric shower is worth considering, as long as the consumer unit can take the circuit.
Supplies across most of Cheshire are moderately hard. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Nantwich. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Tiling or re-tiling around the shower, with tanking behind new tiles in the wet area
- For an electric shower, a check of the consumer unit and whether a new dedicated circuit is needed
- A bath screen, tray or enclosure where the shower is new
- Supply and fitting of the shower valve or unit, riser rail, handset or fixed head
Decisions to make first
Electric shower
Heats cold mains water as it flows, so it works without stored hot water. Higher kW units give more flow; 8.5 to 10.5 kW models need a dedicated circuit, often 40 to 45 amps.
Thermostatic mixer
Blends hot and cold from your system and holds the temperature steady when someone runs a tap. The usual choice with a combi or an unvented cylinder.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

