- Postcode districts
- BS37
- Nearby
- Mangotsfield, Kingswood and Keynsham
- Guide price
- £450–£3,600
- Typical time on site
- half a day to 3 days
- Water
- Hard across most of Gloucestershire
- Survey
- Free, at your home
What does a new shower cost in Yate?
Our guide price for a new shower in Yate is £450–£3,600 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Test and handover
New shower over bath
- Thermostatic bar shower and riser
New shower with enclosure
- Pipework and waste
Guide prices for Yate including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Yate
As well as Yate itself (BS37), we survey in Mangotsfield, Kingswood and Keynsham.
Being a smaller town does not change how we work in Yate: free survey, written quote, one team. If the shower in your Yate home swings between hot and cold, a thermostatic valve is usually the fix. If your Yate bath has no shower over it, a thermostatic bar shower, screen and tiling can usually be added in a day or two.
Water across much of Gloucestershire is hard. If your supply in Yate is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- New pipework and isolation valves, plus a pump only where the system is gravity-fed from a cold tank
- A bath screen, tray or enclosure where the shower is new
- For an electric shower, a check of the consumer unit and whether a new dedicated circuit is needed
- Removal of the old shower, a full-flow test and a handover on isolating and descaling it
Decisions to make first
Head and handset
A handset on a riser rail is versatile and easy for rinsing; a fixed overhead head feels generous but needs strong flow behind it.
Thermostatic mixer
Blends hot and cold from your system and holds the temperature steady when someone runs a tap. The usual choice with a combi or an unvented cylinder.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

