- Postcode districts
- M28, M38
- Nearby
- Farnworth, Swinton and Tyldesley
- Guide price
- £400–£3,300
- Typical time on site
- half a day to 3 days
- Water
- Soft across most of Greater Manchester
- Survey
- Free, at your home
What does a new shower cost in Walkden?
For Walkden, our guide range for a new shower is £400 to £3,300 including VAT. Labour costs in North West England put local prices at about 6% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Test and handover
New shower over bath
- Thermostatic bar shower and riser
New shower with enclosure
- Pipework and waste
Guide prices for Walkden including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Walkden
We cover every part of Walkden, including M28 and M38, and nearby Farnworth (2.3 miles) and Swinton (2.4 miles).
In Walkden, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. We test pressure and flow at Walkden surveys before recommending a shower, so you know how it will perform before you buy. If your Walkden bath has no shower over it, a thermostatic bar shower, screen and tiling can usually be added in a day or two.
Most of Greater Manchester is supplied with soft water. If that holds for your street in Walkden, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Tiling or re-tiling around the shower, with tanking behind new tiles in the wet area
- Supply and fitting of the shower valve or unit, riser rail, handset or fixed head
- A bath screen, tray or enclosure where the shower is new
- A check of your hot-water system, water pressure and flow rate
Decisions to make first
Electric shower
Heats cold mains water as it flows, so it works without stored hot water. Higher kW units give more flow; 8.5 to 10.5 kW models need a dedicated circuit, often 40 to 45 amps.
Power shower
A mixer with a built-in pump, for tank-fed systems only. It lifts a weak gravity shower but must never be connected to the mains.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

