- Postcode districts
- SO14, SO15, SO16, SO17, SO18, SO19
- Nearby
- Hythe, Totton and Hedge End
- Guide price
- £650–£2,000
- Typical time on site
- 1–2 working days
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a bathroom strip-out cost in Southampton?
In Southampton, a bathroom strip-out typically costs £650–£2,000 including VAT, based on South East England prices. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Strip-out only
- Waste taken away
Strip-out and prep
- Walls boarded or patched
Back to brick
- Rotten timber found and repaired
Guide prices for Southampton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Southampton
We work right across Southampton — SO14, SO15, SO16 and 3 more postcode districts — and in neighbouring Hythe and Totton.
Southampton is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. Landlords in Southampton can book a strip-out to see the real condition of a damaged bathroom before choosing between a refit and a renovation. If you are fitting your own bathroom in Southampton, a separate strip-out gets the heavy work and the waste dealt with first.
Most of Hampshire has hard water. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Lights, fan, shaver socket and heated rail disconnected and made safe by a qualified electrician where needed
- Isolating the water and capping the supply to each fitting with a proper end, then checking for leaks
- A note of what was found: floor and wall condition, pipe runs and any damaged timber
- Dust sheets and floor protection on the route out through the house
Decisions to make first
The floor
Old vinyl or tiles on a ply overlay can come up with the ply. Tiles bonded to a screed may need grinding back or overlaying instead.
Keep or lose the plaster
Tiles often come off leaving plaster that can be tiled again. If the plaster comes away with them, the wall is boarded or re-plastered.
Rules that apply in England
In England, stripping out a bathroom does not need planning permission or building regulations approval in itself. Building regulations come in with what follows, such as new drainage under Part H or new circuits under Part P.

