- Postcode districts
- G71, G72, ML3
- Nearby
- Cambuslang, Hamilton and Bellshill
- Guide price
- £600–£1,750
- Typical time on site
- 1–2 working days
- Water
- Soft across most of Lanarkshire
- Survey
- Free, at your home
What does a bathroom strip-out cost in Blantyre?
Guide price in Blantyre: £600–£1,750 including VAT, depending on the room and what you choose. We adjust the national guide for Scotland, where prices are typically about 4% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Strip-out only
- Pipework capped safely
Strip-out and prep
- Ready for fitting
Back to brick
- Plaster and tiles removed
Guide prices for Blantyre including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Blantyre
In Blantyre we cover G71, G72 and ML3; we also cover Cambuslang, 2.7 miles away, and Hamilton.
Being a smaller town does not change how we work in Blantyre: free survey, written quote, one team. If your Blantyre bathroom is upstairs, the stairs and landing are protected before anything heavy comes down. Strip-outs in Blantyre include the waste going away with a licensed carrier, so nothing is left on the drive or the pavement.
Most of Lanarkshire is supplied with soft water. Soft water is kind to grout, so mid-tone and darker grouts stay looking fresh. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Waste loaded and taken away by a licensed waste carrier
- Wall and floor tiles taken off with as little damage as possible to sound plaster
- Isolating the water and capping the supply to each fitting with a proper end, then checking for leaks
- The soil pipe sealed against smells once the WC is off
Decisions to make first
Asbestos testing
In a home built before 2000, a sample test before work starts settles whether a ceiling coating, floor tile or boxing panel needs specialist removal.
Keep or lose the plaster
Tiles often come off leaving plaster that can be tiled again. If the plaster comes away with them, the wall is boarded or re-plastered.
Rules that apply in Scotland
In Scotland, removal work does not need a building warrant, but structural work, altering drainage or forming a new bathroom afterwards may. Where a warrant is needed, it has to be granted before that work starts, so plan the strip-out around it.

