- Postcode districts
- SY16
- Nearby
- Welshpool, Brecon and Ystalyfera
- Guide price
- £550–£1,650
- Typical time on site
- 1–2 working days
- Water
- Soft across most of Powys
- Survey
- Free, at your home
What does a bathroom strip-out cost in Newtown?
As a guide, budget £550 to £1,650 including VAT for a bathroom strip-out in Newtown; your written quote will pin it down. We adjust the national guide for Wales, where prices are typically about 7% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Strip-out only
- Waste taken away
Strip-out and prep
- Walls boarded or patched
Back to brick
- Rotten timber found and repaired
Guide prices for Newtown including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Newtown
We work right across Newtown — SY16 — and in neighbouring Welshpool and Brecon.
Newtown gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If you are fitting your own bathroom in Newtown, a separate strip-out gets the heavy work and the waste dealt with first. We time strip-outs in Newtown for just before the fit, so you are not left without a bathroom while waiting for products.
Supplies across most of Powys are soft. Soft water is kind to grout, so mid-tone and darker grouts stay looking fresh. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Isolating the water and capping the supply to each fitting with a proper end, then checking for leaks
- A note of what was found: floor and wall condition, pipe runs and any damaged timber
- Wall and floor tiles taken off with as little damage as possible to sound plaster
- Removal of the bath or shower tray, enclosure, basin, WC, furniture and accessories
Decisions to make first
The floor
Old vinyl or tiles on a ply overlay can come up with the ply. Tiles bonded to a screed may need grinding back or overlaying instead.
Timing
Strip out just before the fit rather than weeks ahead, so the house is without a bathroom for as short a time as possible.
Rules that apply in Wales
In Wales, a strip-out is not building regulations work on its own. If the room is going back to brick ahead of structural or drainage changes, those parts go through building control under the Welsh regulations.

