- Postcode districts
- CR4, SM4, SW17
- Nearby
- Morden, Wimbledon and Streatham
- Guide price
- £900–£3,100
- Typical time on site
- 1–2 working days (added to a fit)
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does bathroom underfloor heating cost in Mitcham?
Our guide price for bathroom underfloor heating in Mitcham is £900–£3,100 including VAT. Labour costs in London put local prices at about 25% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Electric mat
- Mat under the tiles
Electric, larger room
- Programmable smart thermostat
Wet system
- Screed or low-profile boards
Guide prices for Mitcham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Mitcham
We cover every part of Mitcham, including CR4, SM4 and SW17, and nearby Morden (1.3 miles) and Wimbledon (2.2 miles).
London homes in Mitcham often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. Where a Mitcham home already has a heat pump, or the heating is being altered, a wet underfloor system is worth comparing with electric. Whether your Mitcham bathroom is a small en-suite or a large main bathroom, the mat is sized to the open floor, not the whole room.
Most of Greater London has very hard water. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A check of the floor construction, the room's heat loss and where the thermostat and supply will go
- For wet systems, pipes in low-profile boards or screed connected to a manifold or single-zone kit, with any boiler work done by a Gas Safe registered engineer
- A dial, programmable or smart thermostat, with the supply RCD protected, tested and certified by a qualified electrician
- Resistance and insulation tests on the mat before, during and after tiling, with the readings recorded
Decisions to make first
Electric or wet
Electric is cheaper to install and quick to lay in one room. Wet costs more upfront but is usually cheaper to run where it is fed by a gas boiler or heat pump.
Floor finish
Tiles and stone pass heat through well. LVT and vinyl can work, but check the maximum floor temperature the flooring maker allows.
Rules that apply in England
In England, a new circuit for underfloor heating is notifiable under Part P, and so is connecting it to an existing circuit in a room with a bath or shower. The electrician either self-certifies through a competent person scheme or the work is notified to building control.

