- Postcode districts
- CW7
- Nearby
- Northwich, Crewe and Sandbach
- Guide price
- £350–£1,400
- Typical time on site
- half a day to 1 day
- Water
- Moderately hard across most of Cheshire
- Survey
- Free, at your home
What does a new vanity unit cost in Winsford?
Guide price in Winsford: £350–£1,400 including VAT, depending on the room and what you choose. Prices in North West England run at about 6% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit your unit
- Fitting a unit you have bought
Supply and fit
- Basin, tap and waste
Double or bespoke
- Re-tiling behind
Guide prices for Winsford including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Winsford
In Winsford we cover CW7; we also cover Northwich, 4.7 miles away, and Crewe.
In Winsford, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. We quote vanity unit work in Winsford after seeing the wall and pipework, so any re-tiling is on the quote from the start. If you have bought a vanity unit for your Winsford bathroom, fit-only installation covers connecting the tap and waste and testing for leaks.
Most of Cheshire has moderately hard water. Taps and wastes will need an occasional descale, and chrome or brushed finishes are easier to keep clean than polished brass. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Moving the waste and supply positions where the new unit needs them higher, lower or to one side
- Patching or re-tiling the wall where the old basin left gaps
- Removal of the old basin and pedestal, or old vanity, and taking it away
- A new tap, trap and the correct slotted or unslotted waste for the basin
Decisions to make first
Wall-hung or floor-standing
Wall-hung units leave the floor clear and are easy to clean under, but need a strong wall. Floor-standing units hold more and suit weak or uneven walls.
Waste and overflow
A basin with an overflow takes a slotted waste; one without needs an unslotted waste, often a push-button 'click-clack' type.
Rules that apply in England
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

