- Postcode districts
- EX8
- Nearby
- Exeter, Newton Abbot and Torquay
- Guide price
- £350–£1,550
- Typical time on site
- half a day to 1 day
- Water
- Soft across most of Devon
- Survey
- Free, at your home
What does a new vanity unit cost in Exmouth?
As a guide, budget £350 to £1,550 including VAT for a new vanity unit in Exmouth; your written quote will pin it down. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit your unit
- Taps and waste connected
Supply and fit
- Removal of the old basin
Double or bespoke
- Double basin or long run
Guide prices for Exmouth including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Exmouth
We cover every part of Exmouth, including EX8, and nearby Exeter (9.2 miles) and Newton Abbot (11 miles).
Homes in and around Exmouth vary, so we look at the floor, the walls and the water system before we price anything. We quote vanity unit work in Exmouth after seeing the wall and pipework, so any re-tiling is on the quote from the start. If your Exmouth cloakroom still has a pedestal basin, a compact vanity unit adds storage without taking more floor.
Water across much of Devon is soft. In soft water, taps, wastes and toilet pans scale up slowly, so brushed and matt finishes are a safe choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A new tap, trap and the correct slotted or unslotted waste for the basin
- Moving the waste and supply positions where the new unit needs them higher, lower or to one side
- Fitting the unit level, with the basin sealed to the top and the top sealed to the wall
- Testing for leaks and checking the trap holds its seal
Decisions to make first
Width
Compact units around 400 mm wide suit cloakrooms; family bathrooms often take 600 to 800 mm for one basin and 1200 mm or more for two.
Waste and overflow
A basin with an overflow takes a slotted waste; one without needs an unslotted waste, often a push-button 'click-clack' type.
Rules that apply in England
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

