- Postcode districts
- BH22
- Nearby
- Wimborne Minster, Bournemouth and Christchurch
- Guide price
- £350–£1,550
- Typical time on site
- half a day to 1 day
- Water
- Hard across most of Dorset
- Survey
- Free, at your home
What does a new vanity unit cost in Ferndown?
Our guide price for a new vanity unit in Ferndown is £350–£1,550 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit your unit
- Sealed and tested
Supply and fit
- Floor-standing or wall-hung unit
Double or bespoke
- Stone or solid-surface top
Guide prices for Ferndown including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Ferndown
As well as Ferndown itself (BH22), we survey in Wimborne Minster, Bournemouth and Christchurch.
Being a smaller town does not change how we work in Ferndown: free survey, written quote, one team. If your Ferndown cloakroom still has a pedestal basin, a compact vanity unit adds storage without taking more floor. If your Ferndown water is hard, a tap with a removable aerator and a smooth one-piece basin top are easier to keep clean.
Most of Dorset has hard water. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Fitting the unit level, with the basin sealed to the top and the top sealed to the wall
- Patching or re-tiling the wall where the old basin left gaps
- A check that the wall can carry a wall-hung unit, with fixings to suit solid or stud walls
- Moving the waste and supply positions where the new unit needs them higher, lower or to one side
Decisions to make first
Width
Compact units around 400 mm wide suit cloakrooms; family bathrooms often take 600 to 800 mm for one basin and 1200 mm or more for two.
Wall-hung or floor-standing
Wall-hung units leave the floor clear and are easy to clean under, but need a strong wall. Floor-standing units hold more and suit weak or uneven walls.
Rules that apply in England
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

