- Postcode districts
- OL1, OL2, OL9
- Nearby
- Chadderton, Oldham and Middleton
- Guide price
- £350–£1,400
- Typical time on site
- half a day to 1 day
- Water
- Soft across most of Greater Manchester
- Survey
- Free, at your home
What does a new vanity unit cost in Royton?
Guide price in Royton: £350–£1,400 including VAT, depending on the room and what you choose. We adjust the national guide for North West England, where prices are typically about 6% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit your unit
- Fitting a unit you have bought
Supply and fit
- Basin, tap and waste
Double or bespoke
- Re-tiling behind
Guide prices for Royton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Royton
As well as Royton itself (OL1, OL2 and OL9), we survey in Chadderton, Oldham and Middleton.
Being a smaller town does not change how we work in Royton: free survey, written quote, one team. Landlords in Royton can have a worn basin replaced with a vanity unit in half a day to a day. We quote vanity unit work in Royton after seeing the wall and pipework, so any re-tiling is on the quote from the start.
Water across much of Greater Manchester is soft. In soft water, taps, wastes and toilet pans scale up slowly, so brushed and matt finishes are a safe choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Removal of the old basin and pedestal, or old vanity, and taking it away
- Testing for leaks and checking the trap holds its seal
- A check that the wall can carry a wall-hung unit, with fixings to suit solid or stud walls
- Patching or re-tiling the wall where the old basin left gaps
Decisions to make first
Width
Compact units around 400 mm wide suit cloakrooms; family bathrooms often take 600 to 800 mm for one basin and 1200 mm or more for two.
Wall-hung or floor-standing
Wall-hung units leave the floor clear and are easy to clean under, but need a strong wall. Floor-standing units hold more and suit weak or uneven walls.
Rules that apply in England
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

