- Postcode districts
- ME1, ME4, ME7
- Nearby
- Rochester, Gillingham and Strood
- Guide price
- £400–£1,700
- Typical time on site
- half a day to 1 day
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does a new vanity unit cost in Chatham?
Guide price in Chatham: £400–£1,700 including VAT, depending on the room and what you choose. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit your unit
- Taps and waste connected
Supply and fit
- Removal of the old basin
Double or bespoke
- Double basin or long run
Guide prices for Chatham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Chatham
In Chatham we cover ME1, ME4 and ME7; we also cover Rochester, 1.1 miles away, and Gillingham.
Across a large town like Chatham, homes range from older terraces to newer estates; the survey tells us which pipework and floor we are dealing with. We quote vanity unit work in Chatham after seeing the wall and pipework, so any re-tiling is on the quote from the start. If your Chatham cloakroom still has a pedestal basin, a compact vanity unit adds storage without taking more floor.
Most of Kent has very hard water. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Patching or re-tiling the wall where the old basin left gaps
- A new tap, trap and the correct slotted or unslotted waste for the basin
- Moving the waste and supply positions where the new unit needs them higher, lower or to one side
- Testing for leaks and checking the trap holds its seal
Decisions to make first
Waste and overflow
A basin with an overflow takes a slotted waste; one without needs an unslotted waste, often a push-button 'click-clack' type.
Wall-hung or floor-standing
Wall-hung units leave the floor clear and are easy to clean under, but need a strong wall. Floor-standing units hold more and suit weak or uneven walls.
Rules that apply in England
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

