- Postcode districts
- CH60, CH61
- Nearby
- Bebington, Moreton and Birkenhead
- Guide price
- £350–£1,400
- Typical time on site
- half a day to 1 day
- Water
- Soft across most of Merseyside
- Survey
- Free, at your home
What does a new vanity unit cost in Heswall?
Our guide price for a new vanity unit in Heswall is £350–£1,400 including VAT. Labour costs in North West England put local prices at about 6% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit your unit
- Fitting a unit you have bought
Supply and fit
- Basin, tap and waste
Double or bespoke
- Re-tiling behind
Guide prices for Heswall including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Heswall
In Heswall we cover CH60 and CH61; we also cover Bebington, 3.6 miles away, and Moreton.
Homes in and around Heswall vary, so we look at the floor, the walls and the water system before we price anything. If your Heswall water is hard, a tap with a removable aerator and a smooth one-piece basin top are easier to keep clean. Wall-hung vanities in Heswall homes are fixed to suit what the wall is built from, which we check at the survey.
Water across much of Merseyside is soft. In soft water, taps, wastes and toilet pans scale up slowly, so brushed and matt finishes are a safe choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Patching or re-tiling the wall where the old basin left gaps
- Removal of the old basin and pedestal, or old vanity, and taking it away
- Isolation valves on the hot and cold supplies, so the tap can be changed later without draining the system
- A check that the wall can carry a wall-hung unit, with fixings to suit solid or stud walls
Decisions to make first
Width
Compact units around 400 mm wide suit cloakrooms; family bathrooms often take 600 to 800 mm for one basin and 1200 mm or more for two.
Waste and overflow
A basin with an overflow takes a slotted waste; one without needs an unslotted waste, often a push-button 'click-clack' type.
Rules that apply in England
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

