- Postcode districts
- DE14, DE15
- Nearby
- Swadlincote, Derby and Lichfield
- Guide price
- £350–£1,450
- Typical time on site
- half a day to 1 day
- Water
- Moderately hard across most of Staffordshire
- Survey
- Free, at your home
What does a new vanity unit cost in Burton upon Trent?
Guide price in Burton upon Trent: £350–£1,450 including VAT, depending on the room and what you choose. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit your unit
- Fitting a unit you have bought
Supply and fit
- Basin, tap and waste
Double or bespoke
- Re-tiling behind
Guide prices for Burton upon Trent including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Burton upon Trent
As well as Burton upon Trent itself (DE14 and DE15), we survey in Swadlincote, Derby and Lichfield.
Burton upon Trent has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. Landlords in Burton upon Trent can have a worn basin replaced with a vanity unit in half a day to a day. If your Burton upon Trent water is hard, a tap with a removable aerator and a smooth one-piece basin top are easier to keep clean.
Most of Staffordshire has moderately hard water. Taps and wastes will need an occasional descale, and chrome or brushed finishes are easier to keep clean than polished brass. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Patching or re-tiling the wall where the old basin left gaps
- Testing for leaks and checking the trap holds its seal
- Removal of the old basin and pedestal, or old vanity, and taking it away
- A new tap, trap and the correct slotted or unslotted waste for the basin
Decisions to make first
Drawers or doors
Drawers keep things visible and reachable but lose some space to the trap. Doors give a deeper cupboard and cost less.
One basin or two
Two basins help a busy household if the wall is long enough. In a smaller room, one basin with a longer top often works better.
Rules that apply in England
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

