- Postcode districts
- CV31, CV32, CV33
- Nearby
- Warwick, Kenilworth and Coventry
- Guide price
- £350–£1,450
- Typical time on site
- half a day to 1 day
- Water
- Hard across most of Warwickshire
- Survey
- Free, at your home
What does a new vanity unit cost in Royal Leamington Spa?
In Royal Leamington Spa, a new vanity unit typically costs £350–£1,450 including VAT, based on West Midlands prices. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit your unit
- Taps and waste connected
Supply and fit
- Removal of the old basin
Double or bespoke
- Double basin or long run
Guide prices for Royal Leamington Spa including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Royal Leamington Spa
As well as Royal Leamington Spa itself (CV31, CV32 and CV33), we survey in Warwick, Kenilworth and Coventry.
Homes in and around Royal Leamington Spa vary, so we look at the floor, the walls and the water system before we price anything. If your Royal Leamington Spa water is hard, a tap with a removable aerator and a smooth one-piece basin top are easier to keep clean. Landlords in Royal Leamington Spa can have a worn basin replaced with a vanity unit in half a day to a day.
Supplies across most of Warwickshire are hard. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A new tap, trap and the correct slotted or unslotted waste for the basin
- Isolation valves on the hot and cold supplies, so the tap can be changed later without draining the system
- Patching or re-tiling the wall where the old basin left gaps
- Removal of the old basin and pedestal, or old vanity, and taking it away
Decisions to make first
Width
Compact units around 400 mm wide suit cloakrooms; family bathrooms often take 600 to 800 mm for one basin and 1200 mm or more for two.
Drawers or doors
Drawers keep things visible and reachable but lose some space to the trap. Doors give a deeper cupboard and cost less.
Rules that apply in England
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

