- Postcode districts
- BA12
- Nearby
- Westbury, Frome and Trowbridge
- Guide price
- £350–£1,550
- Typical time on site
- half a day to 1 day
- Water
- Hard across most of Wiltshire
- Survey
- Free, at your home
What does a new vanity unit cost in Warminster?
As a guide, budget £350 to £1,550 including VAT for a new vanity unit in Warminster; your written quote will pin it down. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit your unit
- Taps and waste connected
Supply and fit
- Removal of the old basin
Double or bespoke
- Double basin or long run
Guide prices for Warminster including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Warminster
In Warminster we cover BA12; we also cover Westbury, 3.9 miles away, and Frome.
Warminster gets the same process as anywhere else: a free survey at your home and a written, itemised quote. Wall-hung vanities in Warminster homes are fixed to suit what the wall is built from, which we check at the survey. If your Warminster cloakroom still has a pedestal basin, a compact vanity unit adds storage without taking more floor.
Water across much of Wiltshire is hard. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Patching or re-tiling the wall where the old basin left gaps
- A check that the wall can carry a wall-hung unit, with fixings to suit solid or stud walls
- Removal of the old basin and pedestal, or old vanity, and taking it away
- A new tap, trap and the correct slotted or unslotted waste for the basin
Decisions to make first
Width
Compact units around 400 mm wide suit cloakrooms; family bathrooms often take 600 to 800 mm for one basin and 1200 mm or more for two.
Waste and overflow
A basin with an overflow takes a slotted waste; one without needs an unslotted waste, often a push-button 'click-clack' type.
Rules that apply in England
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

