- Postcode districts
- HP19, HP20, HP21
- Nearby
- Leighton Buzzard, Berkhamsted and Chesham
- Guide price
- £6,700–£13,500
- Typical time on site
- 5–10 working days
- Water
- Hard across most of Buckinghamshire
- Survey
- Free, at your home
What does a wet room cost in Aylesbury?
In Aylesbury, a wet room typically costs £6,700–£13,500 including VAT, based on South East England prices. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Floor former and linear or centre drain
Signature
- Underfloor heating option
Large or luxury
- Full conversion of a larger room
Guide prices for Aylesbury including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Aylesbury
We cover every part of Aylesbury, including HP19, HP20 and HP21, and nearby Leighton Buzzard (9.6 miles) and Berkhamsted (11.3 miles).
Homes in and around Aylesbury vary, so we look at the floor, the walls and the water system before we price anything. If your Aylesbury bathroom is upstairs on timber joists, we check their size and direction before planning the wet room floor. We quote wet rooms in Aylesbury only after looking at the floor construction, because that is where most of the cost difference lies.
Most of Buckinghamshire has hard water. If your supply in Aylesbury is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
- Extractor fan and lighting by a qualified electrician, tested and certified, with underfloor heating if you choose it
- A frameless glass screen fixed to the wall and floor
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
Decisions to make first
Open or screened
A fully open shower with no glass only works in a larger room, with the basin, WC and towels well away from the spray.
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

