- Postcode districts
- WA1, WA2, WA4
- Nearby
- Newton-le-Willows, Golborne and Haydock
- Guide price
- £5,600–£11,250
- Typical time on site
- 5–10 working days
- Water
- Moderately hard across most of Cheshire
- Survey
- Free, at your home
What does a wet room cost in Warrington?
As a guide, budget £5,600 to £11,250 including VAT for a wet room in Warrington; your written quote will pin it down. Labour costs in North West England put local prices at about 6% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Full tanking, porcelain tiles
Signature
- 4–7 m² room
Large or luxury
- Large-format or stone-effect tiles
Guide prices for Warrington including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Warrington
In Warrington we cover WA1, WA2 and WA4; we also cover Newton-le-Willows, 4.1 miles away, and Golborne.
Warrington has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. If your Warrington bathroom is upstairs on timber joists, we check their size and direction before planning the wet room floor. If you are planning a wet room in Warrington for level access, we design the fall and drain so the floor is flush from the doorway.
Most of Cheshire has moderately hard water. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Warrington. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A frameless glass screen fixed to the wall and floor
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

