- Postcode districts
- BT49
- Nearby
- Coleraine, Derry and Magherafelt
- Guide price
- £5,300–£10,500
- Typical time on site
- 5–10 working days
- Water
- Soft across most of County Londonderry
- Survey
- Free, at your home
What does a wet room cost in Limavady?
As a guide, budget £5,300 to £10,500 including VAT for a wet room in Limavady; your written quote will pin it down. Labour costs in Northern Ireland put local prices at about 12% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Limavady including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Limavady
We cover every part of Limavady, including BT49, and nearby Coleraine (12.6 miles) and Derry (14.7 miles).
Limavady gets the same process as anywhere else: a free survey at your home and a written, itemised quote. We quote wet rooms in Limavady only after looking at the floor construction, because that is where most of the cost difference lies. If your Limavady bathroom is upstairs on timber joists, we check their size and direction before planning the wet room floor.
Most of County Londonderry is supplied with soft water. If that holds for your street in Limavady, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- Extractor fan and lighting by a qualified electrician, tested and certified, with underfloor heating if you choose it
- A frameless glass screen fixed to the wall and floor
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Rules that apply in Northern Ireland
In Northern Ireland, building control covers new drainage, ventilation and structural changes to the floor. There is no Part P, but the electrics should be tested and certified to BS 7671.

