- Postcode districts
- DE75
- Nearby
- Ripley, Eastwood and Ilkeston
- Guide price
- £5,800–£11,500
- Typical time on site
- 5–10 working days
- Water
- Moderately hard across most of Derbyshire
- Survey
- Free, at your home
What does a wet room cost in Heanor?
Our guide price for a wet room in Heanor is £5,800–£11,500 including VAT. Labour costs in East Midlands put local prices at about 4% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Heanor including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Heanor
We work right across Heanor — DE75 — and in neighbouring Ripley and Eastwood.
Being a smaller town does not change how we work in Heanor: free survey, written quote, one team. We quote wet rooms in Heanor only after looking at the floor construction, because that is where most of the cost difference lies. If your Heanor home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain.
Water across much of Derbyshire is moderately hard. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Heanor. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
- A frameless glass screen fixed to the wall and floor
- Strip-out, waste removal, a final flow test to the drain and handover
Decisions to make first
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Linear or centre drain
A linear drain along one wall lets the floor fall in a single direction, so large tiles can be laid without awkward cuts. A centre drain needs a four-way fall and suits smaller tiles or mosaic.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.