- Postcode districts
- CO13, CO14
- Nearby
- Frinton-on-Sea, Clacton-on-Sea and Harwich
- Guide price
- £6,400–£12,750
- Typical time on site
- 5–10 working days
- Water
- Very hard across most of Essex
- Survey
- Free, at your home
What does a wet room cost in Walton-on-the-Naze?
Our guide price for a wet room in Walton-on-the-Naze is £6,400–£12,750 including VAT. Prices in East of England run at about 6% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Walton-on-the-Naze including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Walton-on-the-Naze
As well as Walton-on-the-Naze itself (CO13 and CO14), we survey in Frinton-on-Sea, Clacton-on-Sea and Harwich.
Being a smaller town does not change how we work in Walton-on-the-Naze: free survey, written quote, one team. If your Walton-on-the-Naze home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain. If you are planning a wet room in Walton-on-the-Naze for level access, we design the fall and drain so the floor is flush from the doorway.
Water across much of Essex is very hard. If your supply in Walton-on-the-Naze is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
- Extractor fan and lighting by a qualified electrician, tested and certified, with underfloor heating if you choose it
- Strip-out, waste removal, a final flow test to the drain and handover
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
Decisions to make first
Screen size
A screen of 1200 mm or more keeps spray off the rest of the room in most layouts. In a very small wet room, expect the whole floor to get wet.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

