What does a wet room cost in Bury?
For Bury, our guide range for a wet room is £5,600 to £11,250 including VAT. Labour costs in North West England put local prices at about 6% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Full tanking, porcelain tiles
Signature
- 4–7 m² room
Large or luxury
- Large-format or stone-effect tiles
Guide prices for Bury including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Bury
In Bury we cover BL8, BL9, M25 and 2 more postcode districts; we also cover Radcliffe, 2.8 miles away, and Heywood.
Homes in and around Bury vary, so we look at the floor, the walls and the water system before we price anything. If you are planning a wet room in Bury for level access, we design the fall and drain so the floor is flush from the doorway. If your Bury home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain.
Most of Greater Manchester is supplied with soft water. If that holds for your street in Bury, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A frameless glass screen fixed to the wall and floor
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
- Strip-out, waste removal, a final flow test to the drain and handover
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.