What does a wet room cost in South Hayling?
Guide price in South Hayling: £6,700–£13,500 including VAT, depending on the room and what you choose. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Floor former and linear or centre drain
Signature
- Underfloor heating option
Large or luxury
- Full conversion of a larger room
Guide prices for South Hayling including VAT. Your itemised written quote after the free survey is the price that counts.
Working in South Hayling
As well as South Hayling itself (PO11), we survey in Hayling Island, Emsworth and Havant.
Being a smaller town does not change how we work in South Hayling: free survey, written quote, one team. For a wet room in a South Hayling flat, the first step is the lease, because freeholder consent is often needed before any work starts. We quote wet rooms in South Hayling only after looking at the floor construction, because that is where most of the cost difference lies.
Water across much of Hampshire is hard. If your supply in South Hayling is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
- Extractor fan and lighting by a qualified electrician, tested and certified, with underfloor heating if you choose it
- A frameless glass screen fixed to the wall and floor
Decisions to make first
Open or screened
A fully open shower with no glass only works in a larger room, with the basin, WC and towels well away from the spray.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.