- Postcode districts
- GU46
- Nearby
- Sandhurst, Crowthorne and Camberley
- Guide price
- £6,700–£13,500
- Typical time on site
- 5–10 working days
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a wet room cost in Yateley?
As a guide, budget £6,700 to £13,500 including VAT for a wet room in Yateley; your written quote will pin it down. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Full tanking, porcelain tiles
Signature
- 4–7 m² room
Large or luxury
- Large-format or stone-effect tiles
Guide prices for Yateley including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Yateley
We cover every part of Yateley, including GU46, and nearby Sandhurst (1.9 miles) and Crowthorne (2.5 miles).
Yateley gets the same process as anywhere else: a free survey at your home and a written, itemised quote. We quote wet rooms in Yateley only after looking at the floor construction, because that is where most of the cost difference lies. If your Yateley home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain.
Water across much of Hampshire is hard. If your supply in Yateley is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A frameless glass screen fixed to the wall and floor
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- Slip-resistant porcelain floor tiles and wall tiling
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
Decisions to make first
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

