- Postcode districts
- WD6
- Nearby
- Barnet, Bushey and Potters Bar
- Guide price
- £6,400–£12,750
- Typical time on site
- 5–10 working days
- Water
- Very hard across most of Hertfordshire
- Survey
- Free, at your home
What does a wet room cost in Borehamwood?
For Borehamwood, our guide range for a wet room is £6,400 to £12,750 including VAT. Labour costs in East of England put local prices at about 6% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Full tanking, porcelain tiles
Signature
- 4–7 m² room
Large or luxury
- Large-format or stone-effect tiles
Guide prices for Borehamwood including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Borehamwood
We cover every part of Borehamwood, including WD6, and nearby Barnet (3.3 miles) and Bushey (3.6 miles).
In Borehamwood, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. For a wet room in a Borehamwood flat, the first step is the lease, because freeholder consent is often needed before any work starts. In a compact Borehamwood bathroom, a wet room frees the space a tray and enclosure would take, but expect the whole floor to get wet.
Water across much of Hertfordshire is very hard. If your supply in Borehamwood is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A frameless glass screen fixed to the wall and floor
- Slip-resistant porcelain floor tiles and wall tiling
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Open or screened
A fully open shower with no glass only works in a larger room, with the basin, WC and towels well away from the spray.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

