What does a wet room cost in Cheshunt?
Our guide price for a wet room in Cheshunt is £6,400–£12,750 including VAT. Prices in East of England run at about 6% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Full tanking, porcelain tiles
Signature
- 4–7 m² room
Large or luxury
- Large-format or stone-effect tiles
Guide prices for Cheshunt including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Cheshunt
In Cheshunt we cover EN7, EN8 and EN9; we also cover Waltham Abbey, 1.4 miles away, and Enfield.
Homes in and around Cheshunt vary, so we look at the floor, the walls and the water system before we price anything. For a wet room in a Cheshunt flat, the first step is the lease, because freeholder consent is often needed before any work starts. If your Cheshunt bathroom is upstairs on timber joists, we check their size and direction before planning the wet room floor.
Water across much of Hertfordshire is very hard. If your supply in Cheshunt is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
- Slip-resistant porcelain floor tiles and wall tiling
- Extractor fan and lighting by a qualified electrician, tested and certified, with underfloor heating if you choose it
- Strip-out, waste removal, a final flow test to the drain and handover
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.