What does a wet room cost in Colne?
As a guide, budget £5,600 to £11,250 including VAT for a wet room in Colne; your written quote will pin it down. Labour costs in North West England put local prices at about 6% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Colne including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Colne
We work right across Colne — BB8 and BB9 — and in neighbouring Nelson and Burnley.
Being a smaller town does not change how we work in Colne: free survey, written quote, one team. If you are planning a wet room in Colne for level access, we design the fall and drain so the floor is flush from the doorway. If your Colne home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain.
Supplies across most of Lancashire are soft. If that holds for your street in Colne, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Slip-resistant porcelain floor tiles and wall tiling
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- Floor strengthening or a ply overlay on timber floors so the surface does not flex
Decisions to make first
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Open or screened
A fully open shower with no glass only works in a larger room, with the basin, WC and towels well away from the spray.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.