- Postcode districts
- PR1, PR2
- Nearby
- Blackburn, Darwen and Poulton-le-Fylde
- Guide price
- £5,600–£11,250
- Typical time on site
- 5–10 working days
- Water
- Soft across most of Lancashire
- Survey
- Free, at your home
What does a wet room cost in Preston?
Our guide price for a wet room in Preston is £5,600–£11,250 including VAT. Labour costs in North West England put local prices at about 6% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Full tanking, porcelain tiles
Signature
- 4–7 m² room
Large or luxury
- Large-format or stone-effect tiles
Guide prices for Preston including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Preston
In Preston we cover PR1 and PR2; we also cover Blackburn, 9.1 miles away, and Darwen.
Preston is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. We quote wet rooms in Preston only after looking at the floor construction, because that is where most of the cost difference lies. If you are planning a wet room in Preston for level access, we design the fall and drain so the floor is flush from the doorway.
Most of Lancashire is supplied with soft water. If that holds for your street in Preston, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A frameless glass screen fixed to the wall and floor
- Strip-out, waste removal, a final flow test to the drain and handover
- Slip-resistant porcelain floor tiles and wall tiling
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
Decisions to make first
Open or screened
A fully open shower with no glass only works in a larger room, with the basin, WC and towels well away from the spray.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

