- Postcode districts
- CH42, CH62, CH63
- Nearby
- Birkenhead, Heswall and Liverpool
- Guide price
- £5,600–£11,250
- Typical time on site
- 5–10 working days
- Water
- Soft across most of Merseyside
- Survey
- Free, at your home
What does a wet room cost in Bebington?
Guide price in Bebington: £5,600–£11,250 including VAT, depending on the room and what you choose. Prices in North West England run at about 6% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Under about 4 m²
Signature
- Frameless screen, thermostatic shower
Large or luxury
- Concealed valves, feature lighting
Guide prices for Bebington including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Bebington
We cover every part of Bebington, including CH42, CH62 and CH63, and nearby Birkenhead (3 miles) and Heswall (3.6 miles).
In Bebington, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. For a wet room in a Bebington flat, the first step is the lease, because freeholder consent is often needed before any work starts. In a compact Bebington bathroom, a wet room frees the space a tray and enclosure would take, but expect the whole floor to get wet.
Most of Merseyside is supplied with soft water. If that holds for your street in Bebington, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Slip-resistant porcelain floor tiles and wall tiling
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.