- Postcode districts
- CF34
- Nearby
- Briton Ferry, Neath and Bridgend
- Guide price
- £5,600–£11,250
- Typical time on site
- 5–10 working days
- Water
- Soft across most of Mid Glamorgan
- Survey
- Free, at your home
What does a wet room cost in Maesteg?
As a guide, budget £5,600 to £11,250 including VAT for a wet room in Maesteg; your written quote will pin it down. Labour costs in Wales put local prices at about 7% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Full tanking, porcelain tiles
Signature
- 4–7 m² room
Large or luxury
- Large-format or stone-effect tiles
Guide prices for Maesteg including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Maesteg
As well as Maesteg itself (CF34), we survey in Briton Ferry, Neath and Bridgend.
Maesteg gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If your Maesteg home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain. We quote wet rooms in Maesteg only after looking at the floor construction, because that is where most of the cost difference lies.
Water across much of Mid Glamorgan is soft. If that holds for your street in Maesteg, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
- Strip-out, waste removal, a final flow test to the drain and handover
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
Decisions to make first
Screen size
A screen of 1200 mm or more keeps spray off the rest of the room in most layouts. In a very small wet room, expect the whole floor to get wet.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in Wales
In Wales, Part H covers new drainage and the Welsh Part F sets similar extract rates. The Welsh Part P makes more electrical work notifiable than in England, so the electrician should notify and certify the work.

