- Postcode districts
- PA14, PA15, PA16, PA19
- Nearby
- Helensburgh, Dunoon and Vale of Leven
- Guide price
- £5,800–£11,500
- Typical time on site
- 5–10 working days
- Water
- Soft across most of Renfrewshire and Inverclyde
- Survey
- Free, at your home
What does a wet room cost in Greenock?
As a guide, budget £5,800 to £11,500 including VAT for a wet room in Greenock; your written quote will pin it down. Prices in Scotland run at about 4% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Full tanking, porcelain tiles
Signature
- 4–7 m² room
Large or luxury
- Large-format or stone-effect tiles
Guide prices for Greenock including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Greenock
As well as Greenock itself (PA14, PA15, PA16 and 1 more postcode districts), we survey in Helensburgh, Dunoon and Vale of Leven.
Homes in and around Greenock vary, so we look at the floor, the walls and the water system before we price anything. If your Greenock bathroom is upstairs on timber joists, we check their size and direction before planning the wet room floor. In a compact Greenock bathroom, a wet room frees the space a tray and enclosure would take, but expect the whole floor to get wet.
Supplies across most of Renfrewshire and Inverclyde are soft. If that holds for your street in Greenock, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Strip-out, waste removal, a final flow test to the drain and handover
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
- Slip-resistant porcelain floor tiles and wall tiling
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Former or screed
A pre-formed board gives a consistent fall and suits timber floors. A sand and cement screed suits concrete slabs and larger shower areas.
Rules that apply in Scotland
In Scotland, a wet room that alters the drainage, involves structural work to the floor or forms a new bathroom may need a building warrant; a straight refit usually does not. Water fittings must meet the Scottish Water Byelaws 2014.

